Back wall repair
The first major repair is underway: a stainless steel sheet has been cut to fit and is being pop-riveted on to the original back wall. this will seal up the rust holes and provide a new lip for the top cooking surface to be bolted on to. Tomorrow I need to pick up more drill bits as I've only managed to get two holes done and riveted. I will do the oven section next, then look into insulating the firebox with high temperature ceramic wool.
Comments
Post a Comment