Back wall repair


The first major repair is underway: a stainless steel sheet has been cut to fit and is being pop-riveted on to the original back wall. this will seal up the rust holes and provide a new lip for the top cooking surface to be bolted on to. Tomorrow I need to pick up more drill bits as I've only managed to get two holes done and riveted. I will do the oven section next, then look into insulating the firebox with high temperature ceramic wool.

 

Comments

Popular posts from this blog

Internal Repairs on the wood cookstove

Rebuilding the solar set up